SCENARIO
SCENARIO
You have a dual role as an experienced and respected Process Operator and a representative of workers at a large, high hazard site, run by an international chemical manufacturing organization.
The organization has a reputation for having world-class health and safety
culture, with many other industries using them as a benchmark.
It is a legally compliant organization that sets clear objectives and checks that they are
met.
It employs
and retains motivated workers who are aware of their clearly defined and
documented responsibilities and want to continuously improve in their roles.
Absence and
sickness rates are low.
The
organization listens to workers when they raise concerns and response
professionally to external customer complaints.
The organization also takes pride in recording low accident and incident rates and
investigating any near misses to learn lessons and prevent more serious
outcomes.
Across the
organization there are clear lines of internal and external communication. This
allows for effective resolution of complaints.
The organization is fully insured even though the premium is high.
The organization conducts frequent internal audits and is also externally audited.
The process
you operate is running at a reduced production rate, due to a technical problem
with a large storage tank containing a highly toxic product.
You have an
idea what the problem is, but knowing the limits of your authority, you feel
the issue should be escalated to someone more senior.
Local site
managers, engineers, supervisors, and operators meet to discuss the situation.
They conclude that the tank has an internal blockage, that would normally
require a complete process shutdown to clear.
However,
the planned maintenance shutdown is 12-months away.
They decide
to seek advice from the corporate management team to explore whether there is a different solution that would resolve the blockage problem, but keep production going.
The local site and corporate management teams meet by video conference. The corporate management team includes a very experienced senior engineer with 25-years’
company service.
This engineer has overseen process plant modifications, at many international sites,
with zero lost-time incidents.
They all
agreed that modifications could safely be made to the tank, without the need to
shut it down, and that the necessary resources would be made available for this
work.
The senior engineer is sent to the site to advise on, and manage, the changes that are
needed to the tank; and on the day
of arrival presents a solution to you. You are unfamiliar with the technology
to be used for the modification and your reaction is one of disbelief, and you
politely ask if the engineer is serious.
The
engineer invites you to a meeting to conduct a systematic and detailed risk
assessment of the tank modification task.
The Health
and Safety Adviser, worker representatives, and Plant Manager will also be at
the meeting.
At the meeting, the engineer introduces the proposed tank modification and leads the
risk assessment exercise.
The risk
assessment includes consideration of the highly toxic chemical, the release of
which would be catastrophic for workers, as well as people in adjacent businesses,
residential houses and schools.
The
engineer confirms that this proposed modification method is safe and widely a used solution where the safety improvements are worth the cost.
The risk assessment then continues with discussion and agreement on risk evaluation,
existing control measures and any additional control measures necessary.
Some of
these control measures include safe systems of work, a permit-to-work system,
supplementary emergency arrangements and suitable induction training for all
contractors.
Collectively,
these precautions and control measures reduce high risk to low risk.
A summary
of the risk assessment is circulated to all workers likely to be affected by
the proposed modification.
The full version of the risk assessment will be made available on request.
Before
commencing the work, a permit-to-work is issued to the contractors carrying out
the tank modification.
The
permit-to-work includes an explanation about the associated risk assessment and
how the plant has been safely prepared for this non-routine modification.
The
contract workers accept the permit-to-work with the necessary precautions,
including wearing of specified personal protective equipment. Precautions
listed on the permit-to-work are also communicated to all
contractors
and other plant workers who may be affected.
The
permit-to-work explains that precautions will be enforced, along with any other
site rules, by active monitoring.
This will be done while you carry out routine plant checks and simultaneously check on the progress of the modification.
To confirm
safe working and clarify overall expectations, you, along with an independent
site contact has been nominated to monitor and liaise with the contractors.
The
independent site contact will also actively monitor and check additional
expectations, such as contractor site entry and exit control, resolution of any
queries and the supervision standard.
You and the
independent site contact will check to see whether the modification work is being
controlled and is progressing as planned.
This is
consistent with the organization’s safe system of work based on the findings of
the risk assessment and the method statement provided by the contractor, the aim is to complete the job safely without incident.
Findings
from inspections form part of the overall health and safety performance review.
The
performance review enables an overall assessment of opportunities for
continuous improvement within the site and reveals any need for change.