ARAMCO
SAFETY SUPERVISOR WRITTEN
EXAM
QUESTION AND ANSWER
PART 2
QUESTION:
1. Why should the electrical panel board breaker list be regularly updated? Select the best answer
a) For thorough record-keeping
b) For isolation in case of emergency
c) Too easy locking and tagging for regular maintenance
d) To determine when breakers need to be replaced
ANSWER:
b. For isolation in case of emergency
QUESTION:
2. Who is allowed to operate the crane?
a) All contractor
b) Trainer under the direct supervisor of a certified crane operator
c) Saudi Aramco certified operators
ANSWER:
c. Saudi Aramco certified operators
QUESTION:
3. Which of the following lifts required critical lift plans?
a) Operation inside a warehouse
b) Operation inside the building construction
c) Lifting a load that weighs 20 tons
d) Lifting a large load that requires 3 cranes
ANSWER:
d. Lifting a large load that requires 3 cranes
QUESTION:
4. Who can complete the field inspection and tagging of a special scaffold taller than 6m or 20 ft?
a) Any Saudi Aramco employ
b) Any contractor employee
c) Scaffold inspector
ANSWER:
c. Scaffold inspector
QUESTION:
5. What must you do before you rely on a fall arrest system?
a) Attached a weight and let it fall
b) Company name
c) Inspect that fall arrest system
ANSWER:
c. Inspect that fall arrest system
QUESTION:
6. When working within one arm’s length of electrical equipment you should not wear which of the following.
a) Jewellery
b) safety shoe
c) Safety Glass
ANSWER:
a. Jewellery
QUESTION:
7. Who should inspect cranes prior to their use? Select the best answer.
a) Contractor
b) Shift supervisor
c) Engineers
d) Operations
ANSWER:
d. Operations
QUESTION:
8. When should Ground Fault circuit interruption be
used?
a) At all times
b) When using a portable electrical tool
c) In the dump area
d) When using temporary work
ANSWER:
a. At all times
QUESTION:
9. What is the minimum safe distance between an overhead power line up to 50,000 V (volts) and any part of a crane? Select the best Answer.
a) 1.8 m (6ft)
b) 2m (7ft)
c) 3m (10ft)
d) 6m (20ft)
ANSWER:
C. 3m (10ft)
QUESTION:
10. You are about to raise an elevating work platform. What should you do?
a) Retract the outriggers so that the lift is easily moved
b) Ensure you and tools carry are within weight limits
c) Connect the lanyard of your harness to the anchor point
ANSWER:
c. Connect the lanyard of your harness to the anchor point
QUESTION:
11. What is the correct slope at which ladder6 should be used?
a) 3m horizontal for 1m vertical
b) 1m horizontal for 3m vertical
c) 4m horizontal for 1m vertical
ANSWER:
c. 4m horizontal for 1m vertical
QUESTION:
12. Crane lift shall not be allowed at wind speed above…….unless otherwise specified by the manufacturer. Select the best answer.
a) 10 km/h (6mph)
b) 32 km/h (20mph)
c) 20 km/h (13mph)
d) 64 km/h ( 40mph)
ANSWER:
b. 32 km/h (20mph)
QUESTION:
13. Which of the following should have an inspection sticker before a crane lift?
a) The load
b) LMI
c) The rigging equipment
d) The outrigger mates
ANSWER:
c. The rigging equipment
QUESTION:
14. Who can erect scaffolding shorten than 12.2m (40ft)? Select all items that apply.
a) Any team of Saudi Aramco employees
b) Approved specialist scaffolding erectors
c) Any team of experienced contractors
ANSWER:
b. Approved specialist scaffolding erectors
QUESTION:
15. What should know the weight of before beginning a lift?
a) The load
b) The crane
c) The rigging equipment
ANSWER:
a. The load
QUESTION:
16. When the crane is traveling how should the boom be positioned? Select the best answer.
a) Raised with the hook free
b) Raised with the hook secure
c) Lowered with the hook free
d) Lowered with the hook secure
ANSWER:
d. Lowered with the hook secure
QUESTION:
17. Above what weight are the critical lift plans required?
a) 50 tons
b) 40 tons
c) 30 tons
d) 20 tons
ANSWER:
b. 40 tons
QUESTION:
18. You have to work on a fixed elevated work
surface. What should you do before working?
a) Test by exceeding the maximum weight
b) Test using a personal fall arrest system
c) Look for and guard all floor openings
ANSWER:
c. Look for and guard all floor openings
QUESTION:
19. How should personnel be transferred using a crane? Select the best answer.
a) Slings
b) Ropes
c) Man baskets
d) Mobile scaffold
ANSWER:
c. Man baskets
QUESTION:
20. You are performing high voltage work and are
wearing all PPE. What after that may be required to provide insulation from
energized or grounded.
a) Conducting Mets
b) Non-conducting Mats
c) Conducting Blankets
d) Non-conducting Blankets
ANSWER: